Term: “horizontal traceability”. It refers to the traces of requirements for a test level through the test documentation layers (for example, test plan, test design specification, test case specification, and test procedure specification or test script).
Search Results for:
Verification
Term: “verification”. It is the confirmation that all the specified requirements have been met through an exam and the presentation of objective evidence. [ISO 9000]
Output value
Term: “output value”. It is the instance of an output. Also look up output.
Input value
Term: “input value”. It is the instance of an input. Also look upinput.
Validation
Term: “validation”. It is the confirmation through examination and objective evidence that all the requisites for the foreseen use or application have been met. [ISO 9000]
Test infrastructure
Test: “test infrastructure”. The term defines the artifacts particular to the organization, consisting of test environments, testing tools, managing environment and procedures, necessary to carry out the test.
Test manager
Term “Test manager”. It is the person in charge of project management for the test activities and resources, as well as the assessment of a test object. A person directing, controlling, managing, planning and regulating the assessment of a test object.